Monday, 14 October 2013

Software development process in Startups


In software development we always start with “Hello World”. We never start with “ABC”. My little one was watching "fruit train" today and this made me think about it. Sometimes we jump into “Hello World” without learning ABC. A dev team for startup is different. How you build it defines most of the tech startups.  

When I thought about process of software development it got outlined as mixture of process and principles. Following is what I discovered.

Agile Process:


The mission statement of our dev team is “Quick with Quality”. We cannot choose one from either of them. This is also one of the reason “People matters” (See my earlier blog). Recruiting the right people will enable you achieve both.
Development process makes quality of deliverables from all the team members agonistic of quality of the people. Common mistakes are avoided by following process. I think if you have right team with business acumen, need for strict process reduce drastically. And building that team is what it takes.
Mostly testing is ignored in early stage start-ups which leads to demo syndrome* and poor quality. This also leads to team getting randomized with lot of bug fixes. Following will help to improve quality and efficiency:
Buddies in team:
1.       Testing each other’s code :Testing improves quality and product understanding.
2.       Avoid single point of failure: At least two developers knows the code and configurations. This will come handy for you in many ways in development and business practice.
Automate: Whenever you have time automate the testing as much as possible. Start by writing Build Verification Test (BVT) and move towards Unit Testing(UT). Start the practice before your code base becomes very large.
Sandbox environment: It is very important to build a sandbox testing environment. Everything works in developer’s box**.Virtual environments is means to reduce the cost.
Scrum: Daily standup meeting are very critical to keep the team focused and achieve the mile stones. As advocated by Scrum Gurus keep it brief and precise. Keep the sprints as short as possible. Maintain backlog of the all the requirements and feedbacks. 

Source control, reviews and testing should be mandated even for small teams.


Business validation process:


In startup the software development team should be integrated to product, customer engagement and sales team. Business development and software development can’t be separated. It is very important for leaders to define purpose and principles of the start-up and make sure that team knows about it. If developer is doing something other than core business, Stop!. It doesn't mean stop innovating, it means focus.
When you reduce the barrier between dev and other teams the inevitable side effect are following:
  • Team getting randomized by others teams
  • Lot of noise-business requirements from other team.
It is very critical for dev leader to make sure that it doesn't go to this extent.
When it comes to features to implement its a haywire. Pick your right battle at right time. Pick the "Right" features for the customer rather than allowing customer to pick the "Right" feature. This task is very difficult than most of us think, especially if your audience is diverse. The above doesn't mean you don't listen to customer. Following practice might help.
  • Problem Validation: Does the problem exist for wide audience.
  • Feedback Analysis: Filter the noise from customer feedback. And prioritize the feedback.
  • Product Validation: Do you want to solve the problem now or guide customer towards some existing solution. It might include suggesting your competitor or other solution providers.This is tough for most of us.
In spite of the speed of development, uniformity among different components, intuitiveness of the eco- system, focus on the problem and value add should not be derailed.
Don’t develop features which you like. "Disconnect” yourself, listen to the market and solve the most important problem. After all you’re not going to use it, your customers are.

Continuous development process:

When you are travelling very fast small mistakes get amplified with time. Continues feedback and corrective actions doesn't have any substitute. Earlier you listen to feedback and fix it less catastrophic it will be.
Following helps in continues development and deployment:
Continues deployment: Integrate as often as possible in the sandbox environment. Let each developer take pride about not breaking the integration environment. There should be daily continuous deployments to sandbox.
Continuity plan: A startup needs business continuity plan. It can be simple but there should be a plan.
Enable the team: Once you have right team, enable the team. We don’t have robots to do software development yet. Come back to reality. Acknowledge that people make mistakes. They need higher purpose to work in startup. Allow them to make decisions, allow them to make mistakes, allow them to interact with business as required. Don't be overprotective about what you developed from scratch. The team should run without you …period.
Build Operable system: Build software which gives you continues feedback from system and business perspective. I have discussed this in detail earlier.
============================================================== 
* Demo syndrome : Your application never works when you go for demo with client or leaders..
** Dev box : Developers computer. 
 
 

Monday, 9 September 2013

Steps towards software operability

The generic definition for operability in Wikipedia is “Operability is the ability to keep an equipment, a system or a whole industrial installation in a safe and reliable functioning condition, according to pre-defined operational requirements”. The definition seems to be applicable to critical application software deployments also. The clause of “pre-defined operational requirements” either makes it vague or makes the definition customizable.

An operable system not only satisfies business functionality for end-user but team behind it. For example for making an eCommerce site working 24X7 requires a lot of operability efforts in design to post-deployment phase.

The projects I worked in past couple of years demanded high operability. This made us think in different ways of designing and planning. The cost you pay for not having operability practices in place is very high. It can shoot your company into “Wall of shame”.

Tackling operability issues of your project require following acts:

Sell it first: Operability is inevitable, to which extent depends on the project. Try to get a deeper understanding of the operability requirements from your previous projects or similar projects. Prepare well in this phase, tough questions awaits you. What, How and When should be detailed to evaluate the need, extent, benefit and cost involved. Sell operability needs of your project to the management, it involves cost.
 
If it is an existing project you might stop here and continue the way you’re executing the project. Operability is nothing new it always existed and you might already have things in place. But please read phase two “Get the act together” to make sure that you didn’t miss anything while planning.

For management also this is critical phase to understand and justify the cost paid for operability especially in agile projects.

Get the Act together: Since we are past the phase 1 you are ready to “Get the act together”. This does not happen as part of business requirement it needs some extra effort in all the phases of development. It is strongly recommend to have a separate team which will enforce the principles of operability, build/customize tools and framework to suit your deployment. This allows focus, reuse and policing of operability. Having said that separating functional requirements and operability can be fatal to the project.
 
Operability team should improve the process/framework via continuous feedback. The functional team adopts the operability by infusing it into the business requirements.
Operability should be part of all phases of Software Development Life Cycle (SDLC).Let us look at each of the phase from operability perspective.
Design: Define clear milestone goals for operability. Operability goal can be in following areas
1.       Performance
2.       Scalability
3.       Security
4.       Recoverability
5.       Backward compatibility
6.       Deployment
7.       Rollback
8.       Monitoring
9.       Reporting system health
10.   Trouble shooting
11.   Testing the points 1-10
All of the above should be present in one form or other in all your critical projects. If not remember about “Wall of shame”.

Development and Testing: Practically this might be the longest phase in most projects. As far as operability is concerned this should be the shortest one. If operability tasks is taking longer go back to operability team. They need to fix it.

The main intention of this phase is to follow instructions/guidelines and make sure that next phases doesn’t require human intervention. You should never lose a chance to automate.
Ensure to log in standardized format across all applications as appropriate to enable monitoring and troubleshooting in next phase.

Testing for scalability, performance, backward compatibility, rollback has to execute as planned in previous phases. This is your last chance to avoid catastrophic failures. Collect as much information as possible and do analysis of the variations from baseline during performance/stress tests.

Deployment: Deployment should be automated with rollback plan in place. For high  availability you might also consider Business Continuity  Plan (BCP).Auditing of the deployment and production testing will also help to improve the overall operability.

For complex deployment auto provisioning system can be used.It is generally good idea to do dry run before the actual deployment to make sure that all environment specific attributes are taken care of.

Watch Out!
I would say this is the most critical stage in operability. In this phase application is monitored and feedback is given to the system.
Tools required for this phase can be built or off-the-shelf product can be used. The logs collected should be stored to do analysis and reports.

Monitoring: Monitoring trending errors, performance parameters, application parameters and system parameters critical to project happens in this phase. Servers, Load balancer, Storage, Network, and Switches are possible candidate for monitoring. Use dashboard/alerts for monitoring the application.

Troubleshooting: How good you’re in “Get the act together” phase is usually defined by how fast you’re able to trouble shoot production. Design to make sure that the exact module which failed is identified immediately.

Classify the issues identified in this phase and formulae strict guidelines for the action. Also feedback should be given to phase 1 and phase 2.

Cloud Computing
Does the above applies to cloud computing?Absolutely.
At least in SaaS I would expect the provider to have a great operablity infrastructure.

Take away
Consider operability requirements as a critical deliverable. The key take away while designing and architecting the system are.
  • Evaluate: The extent of operability
  • Specialize: Form a specialized team for operability
  • Automate: Remove manual steps
  • Feedback: Give actionable feedback to the system